General Description
Equipped using the zero leak bidirectional checking sole-noid valves, this energy unit is built for that operation of two independent circuits. Which are respectively for your principal and subordinate platforms of the double scissors lift. Two cut-off valves are utilized for reducing the machine manually in situation of energy loss. If more independent circuits are required to your application please contact us for availability.
Remark: one. Please talk to our sales engineer for your distinctive pump displacement, motor electrical power or tank capacity.
2. CSA or UL certified motors can be found upon request.
Distinctive Notes
one. The AC motor is of S3 duty cycle, which may only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean all of the hydraulic components concerned in advance of installation of the energy unit.
3. Viscosity of the oil shoud be 15~46 cst,plus the oil really should be clean and free of charge of impurities,N46 hydraulic oil is advisable.
four. The power unit really should be mounted vertically.
5. Check the oil degree in the tank following the initial running of your power unit.
6. Oil shifting is required soon after the first one hundred operation hrs,afterwards once every 3000 hrs.